Connecting to a sewer

芒果pvn

If you're planning to connect or reconnect to one of our sewers, you’ll need our consent before you go ahead. That’s because we need to check the connection will work as planned and that it won’t potentially cause problems such as sewer flooding or pollution. We have legal duties around this, set out in Section 94 of the Water Industry Act 1991 (‘the Act’).

Sewer connections can be made directly to a public sewer or indirectly to a private drain that in turn discharges to a public sewer. Whether your connection is direct, indirect, or if you're seeking to relocate an existing manhole, an application form must be completed.

You can either connect to a local sewer under Section 106 of the Act or in some circumstances to a trunk or chemical sewer under Section 107 of the Act. Connecting to trunk or chemical sewer can be complex and dangerous so we'll need to carry out this work for you.

If your proposals are covered by a planning application, no right of connection to a public sewer exists under the Water Industry Act 1991 until planning approval has been granted and any drainage conditions discharged. We'll therefore be unable to approve a sewer connection application made before planning is granted.

芒果pvn

芒果pvn

雷霆每天免费2小时加速 ,雷霆加器速下载,雷霆加器速  一元机场,一元机场加速器,一元机场官网  云梯加速器app下载官网,小蓝鸟特推加速器,速云梯加速器官网,飞鱼加速器  飞鱼加速器ios下载,飞鱼vp加速器使用方式,飞鱼加速器官方网下载,飞鱼vp无限时长  元链加速器pc版下载,元链加速器mac下载,元链加速器npv,元链加速器vqn  苹果软件,ios加速软件,苹果加速器,bilibili加速器网址